ISO TOLERANCE ASSURANCE
Zero-defect protocol and coordinate measurement verification
±0.005mm
tolerance limit
CpK >= 1.67
process capability
100%
first-article inspection
METROLOGY PROTOCOL
01
02
03
04
Billet Verification
In-Process SPC
Optical CMM Analysis
Traceable Sign-Off
Incoming material testing and mill test certificate verification for alloy composition and hardness metrics.
Statistical process control monitoring critical dimensions during CNC milling and turning operations.
Coordinate measuring machine verification against 3D CAD models to validate complex geometric tolerances.
Final inspection reports and heat-lot documentation packaged with every outgoing production batch.
Request complete compliance checklists
Contact engineering for sample inspection sheets, material test reports, and CAD evaluation timelines.
